Gently slide the flatter side of the drip edge under the eave.
How do i install a drip edge on a roof.
If you do make sure the nails will not align with any shingle seams or cutouts above.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
Using a utility knife cut back the front end of the drip edge.
You may need to nail through the starter strip into the drip edge.
Please like and subscribe for more instructional videos.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Using drip edge with a nailing edge approx.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
Install sheet metal drip cap over the lower rim.
Build the lower rim of roof extended away from the fascia.
The extension should be at least inch for it to work.
If it doesn t pull the drip edge out slightly from under the shingles.
Slide the corner tight to the fascia.
Be sure to tuck the drip edge under the starter strip and felt paper.
Step by step install drip edge on a metal roof.
Slowly lift a shingle that is closest to the apex of the roof.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
By installing corrugated metal roof drip edge it will be easier for that mass to move down or be removed.
How to install a drip edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Secure the drip edge with roofing cement.
Push the drip edge a bit so that it passes under the shingle and appears from its other side.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Place a nail at one end then the other.
Space the fasteners by about 12 inches.
4 deep nail the drip edge to the sheathing every 16.