Felt paper also called tar paper or builder s paper helps shed water that gets under the shingles protects the asphalt shingles from the resins in the wood decking increases a roof s fire rating and helps keep your house dry if it rains during the job.
How do you attach roofing to a peak.
Trim the shingles away from the ridge vent hole.
Polycarbonate roofing is a type of roofing that is often clear though it is available in different colors.
Next cut out slots in rafters so a 2 x 4 will sit flush with it on the cap plate.
Polycarbonate roofing installation instructions.
Capping a roof is the last thing done during a roofing project.
They also come in 12 lengths if you have a bigger roof to cover.
You will then need to repeat this process on the other side of the peaked roof.
If nailed to both the flashing may deform under the pressure from shifting brick or wood.
Add the flashing to the roof.
Continue to measure 2 x 4 s to allow nailing at each truss until you reach the end of your roof and add the additional 6 inches and 1 1 2 inches for that end.
It is commonly used on greenhouses to.
Lay this peak piece in place on the top of the roof overlapping the row of metal below.
Attach the plastic ridge vent with 3 roofing nails.
Do the same when you reach the peak from the other side of the roof.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
When you install roof flashing you will need to use a sealant.
Now comes the part where you adding some finishing touches to the roof ensuring that it is completely protected against the elements e g.
Horizontal plastic closure strips these attach to the top of the pergola to hold the roofing panels on since they should be installed every 2 feet you will need about 5 for every 8 length of paneling.
Clear roofing panels i used the suntuf 26 x 8 panels.
Attach the peaked ridge cap.
It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a.
Attach he ridge cap shingles with two nails each.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
Finish the top by adding a peaked ridge cap that is shaped just like your roof.