Wood siding should be 4 or so from the ground whether that be soil or solid surface.
How far to go down on siding.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Would have been nice to show the proper way to finish siding down to a patio.
When it is higher from the ground splashing water onto the wood is minimized.
Six inches would not be too far.
The recommended width of step flashings will vary depending on the agency entity being referenced.
Can be used if the screws do not restrict the normal expansion and contraction movement of the panel on the wall.
The wood is not sitting in a moist or wet condition so it is not wicking moisture.
1 to 1 25 4mm to 38 1mm for trim.
June 26 2014 at 8 54 pm.
Install the drip edge one foot from the siding when controlling a grade and a little outside the drip line of a home when controlling splashing water.
If your grade is level with the siding install a drip edge level with the mulch.
Measure the bottom piece of siding to the proper length which is the length of the wall to the roof line minus 2 inches.
This results in a 2 inch minimum head lap.
Hardie siding requires a minimum 2 gap from all hard surfaces like decks or rooflines and at least 8 from any soft surfaces like grass dirt or gravel.
2 50 8mm for residing.
However the typical recommended width of step flashing ranges from 5 inches to 10 inches.
It protects the sheathing from rain snow and pests.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
The further the better.
A 5 inch wide flashing will result in a 2 1 2 roof deck flange and 2 1 2 vertical wall flange.
Leave a 1 2 gap from the top of the edging to keep mulch from touching the siding.
During my time working for james hardie i very rarely got calls from homeowners that wanted to submit a warranty claim for their hardie siding.