If you re hanging your sheets horizontally measure 48 down from the ceiling and place a mark on two studs.
How long to hang a sheet of drywall.
Insert one drywall screw deep enough into each stud to hold your piece of wallboard.
If the walls studs fall 16 inches on center a 12 foot long sheet will cover approximately 10 studs.
However right now i can tell you a broad estimate for any drywall installation.
Keep in mind that some of them you can control and some you cannot.
It will even tell you what drywall scraps will be left over.
1 4 inch is the choice for curved walls and arches.
It lays out sheets one at a time to come up with a sheet count estimate.
Small job should add 1 to 2 hours for hanging and taping each.
From end of sheet with a drywall square.
Mark fastening guidelines every 16 in.
5 8 inch is heaviest and the most soundproof.
1 hr to stock 1 hr to clean up and 1 hr for dump.
Measure from the end of the ceiling to the middle of a joist and cut the sheet to length.
Factors that affect the drywall installation time.
The sheets most commonly available in hardware stores measure 4 by 8 feet but lengths can reach up to 16 feet and widths up to 54 inches which speeds the installation and minimizes the number of seams.
While diyers usually work with 8 ft long panels the pro method usually is to use 10 or 12 ft long drywall panels which sometimes will cover the entire length of smaller rooms.
Gaps at ends and splices should be less than 1 4 in.
This means working with the largest drywall panels and pieces you can handle safely.
One day to four weeks.
So that total comes to about.
Shorter for easier fitting.
You re essentially making a ledge on which to rest a large piece of wallboard.
For instance some factors are affecting the timeline of each project.
End cuts should split framing members.
Now we have difficulty factor to further reduce these numbers.
Cut overall lengths 1 4 in.
Half inch is the preferred thickness for walls and ceilings.
Add in material costs dump fees and 5 profit and 10 overhead.
If you hang the drywall perpendicular to the studs you ll end up using about 5 screws in each stud.
It assumes all studs are 16 inch on center and staggers the upper and lower sheets as would be done the real world.
Professional drywall hanging crews generally consist of two workers.
5 8 inch works best if studs or joists are 24 inches apart where thinner drywall would sag.