That would certainly cause trouble in some truck stops if the power came from the grid.
How many solar panels will megachargers need for tesla semi.
Solar could not be only on the top but also on the sides for additional capacity.
Estimates are 1000kwh for the semi with 800kwh supplied in a 30 minute charge.
So to charge 1 semi a day 800kwh would need 800 square metres.
Tesla s plan to electrify the trucking industry is taking shape.
Musk has spoken publicly of doing something similar for its heavy duty trucks by installing a network of solar powered megachargers that could juice up a semi battery in 30 minutes.
What makes this a non issue is the newly announced megachargers at truck stops.
We know that a solar panel makes about 1kwh a day per square metre.
If a mega charger is going to be solar powered.
Before you order we will show you the system size that saves you the most money.
And for those 12 trucks they d need to store that 800kwh x 12 in powerpacks.
12 trucks a day would need 100m x 100m solar cells more really as the angle to the sun requires more space.
So to charge 1 semi a day 800kwh would need 800 square metres.
Though some will charge at midday so lets bump it down to 8mwh of powerpacks.
That s a lot of solar.
12 trucks a day would need 100m x 100m solar cells more really as the angle to the sun requires more space.
The company s semi truck set to hit the roads in 2019 is set to power up using solar energy charging stations every 400 miles.
So to charge 1 semi a day 800kwh would need 800 square metres.
We know that a solar panel makes about 1kwh a day per square metre.
How many solar panels do i need.
That means coving a 400 car parking lot at the mega mall or outlet stores with solar carports would deliver enough energy for over 1 million tesla semi truck miles.
If you hear someone say it would take the power of 4000 homes you know that it is energy that matters and that it only takes 5 or 6 houses worth of solar to supply a typical tesla semi s annual needs.
Close up look at the tesla semi.
Tesla did not provide a date on when the megacharger network would be added but we do know that first production of the tesla semi is slated for sometime in 2019.
That would certainly cause trouble in some truck stops if the power came from the grid.